HPlogo APPC Subsystem on MPE XL Node Manager's Guide: HP 3000 MPE/iX Computer Systems

Appendix C Configuration Worksheets

» 

Technical documentation

Complete book in PDF
» Feedback

 » Table of Contents

 » Glossary

 » Index

The worksheets in this appendix are provided to help you plan your APPC subsystem configuration. Before you fill them out, you should read Chapter 4 “APPC Subsystem Configuration”

At the beginning of Chapter 4 “APPC Subsystem Configuration” is a section called "Data Required from the Remote Configuration." You will need the information listed in that section to complete the configuration worksheets.

NOTE: You must configure all the SNA nodes and LUs you will use before you configure the APPC subsystem. SNA node configuration is described in the SNA Link/XL Node Manager's Guide.

This appendix contains the following:

  • The "Completing the Worksheets" section gives step-by-step instructions for filling out the Independent LU Session Types worksheet, the Dependent LU Session Types worksheet, and the Mode Types worksheet.

  • The "Example Worksheets" are completed worksheets for the example configuration described in Appendix B “Sample Configuration”

  • One copy of the Independent LU Session Types worksheet, one copy of the Dependent LU Session Types worksheet, and one copy of the Mode Types worksheet are included at the end of this appendix.

Make some photocopies of the worksheets before you start filling them out so you will have enough room to plan your whole configuration.

Feedback to webmaster