HPlogo Communicator e3000 MPE/iX Release 7.0 (Software Release C.70.00) > Chapter 2 Task Checklists

Checklist I. Modify Remote System

MPE documents

Complete PDF
Table of Contents
Glossary
Index

Use this task checklist if your source material was on CD-ROM and you are now using a CSLT tape to:
  • Update your remote system software version

  • Update your remote system software version and applying PowerPatch patches


NOTE:
  • Before performing the activities in this checklist, you must have completed the appropriate activities on the checklist H, "Update with CD-ROM."

  • For each remote system you are modifying, complete the activities in this checklist.

  • You cannot apply Reactive patches at the same time you are updating the system. You must apply Reactive patches after you update the remote system. To apply Reactive patches (after you update the system) refer to Checklist A, "Manage Patches," or Checklist B, "Manage Patches by Staging Area."


Print a copy of this checklist for each remote system that you are updating.

Read and perform the steps only in the following sections on your remote system:

Begin Preparation Tasks. Does not require exclusive access to the system.

Log onto your remote system. Preparation Tasks completed. Schedule downtime for exclusive access.

Begin Exclusive Access Tasks.
  • Chapter 5 "Modifying Your System"

    • 5.11 Securing the System

      Record terminated logging processes:

      Record temporary filename for the COMMAND.PUB.SYS file:

    • 5.13 Applying the CSLT Modification

    • 5.14 Restarting the System

    • 5.16 Rerunning HPINSTAL

  • Chapter 6 "Finishing the Process"

    • 6.1 Configuring Datacomm and UPS

    • 6.4 Setting Passwords, Lockwords, and UDCs

    • 6.5 Configuring Manually Installed Products

    • 6.6 Setting Up the TAR Utility

    • 6.7 Performing the Final Reboot

    • 6.8 Restarting Selected System Functions

    • 6.9 Backing Up Your System

    • 6.11 Finishing Up

Checklist I tasks completed.

If you have Reactive patches to apply, proceed to one of these checklists:
  • Checklist A, "Manage Patches"

  • Checklist B, "Manage Patches by Staging Area"

Record system change:
  • System name:

  • System type:

  • Date change made:

  • Change performed by:

  • OS version from:

  • OS version to:

  • Comments:




Checklist H. Update with CD-ROM


Checklist J. Reinstall Using a CSLT