HPlogo SNA NRJE Node Manager's Guide: HP 3000 MPE/iX Computer Systems > Chapter 4 NA NRJE Workstation Startup and Shutdown

Before You Start a Workstation

» 

Technical documentation

Complete book in PDF
» Feedback

 » Table of Contents

 » Glossary

 » Index

Before you begin starting up workstations, you must have prepared a job stream file for each workstation you want to start. Each job must be named Wsid.NRJE.SYS, where Wsid is the workstation's configured identification. When you issue a command to start an NRJE workstation, the corresponding Wsid.NRJE.SYS file is streamed. Each job must be in this format:

     !JOB NRJEuser.SYS,NRJE
     any JCWS, etc.
     !RUN NRJEMON;INFO="Wsid"
     !EOJ

where

  • Manager is a user who has all the MPE capabilities except system manager (SM), which is optional.

  • Wsid is the wsid for the workstation. This must match the wsid in the job's file name.

This stream job starts NRJEMON, which is the monitor for SNA NRJE workstations. You can include other MPE commands in the stream file. For example, a JCW can be used to determine whether to automatically restart NRJE. See the SNA NRJE User/Programmer Reference Manual for more information.

NOTE: If you are using the SNA Server for the node, the stream job is different. See Chapter 2 “SNA NRJE Installation Guidelines” of the HP SNA Server/Access User's Guide for more information.

If several NRJE workstations are going to be run simultaneously, increase the limit on the number of jobs so that it accommodates the number of workstations that will be active.

Feedback to webmaster