HPlogo HP 3000/iX Network Planning and Configuration Guide: HP 3000 MPE/iX Computer Systems

Chapter 14 Operating the Network

» 

Technical documentation

Complete book in PDF
» Feedback

 » Table of Contents

 » Glossary

 » Index

After you have completed the configuration process, you are ready to activate NS. This chapter shows you how to bring up an NS 3000/iX node and how to shut it down. It assumes you have successfully completed the configuration steps described previously.

For more detailed information on starting, stopping, and operating an NS network, see the NS 3000/iX Operations and Maintenance Reference Manual.

This chapter includes step-by-step instructions to help you perform the following tasks:

  • Start links and services.

    • Start software loopback (optional).

    • Start the links.

    • Start Network Services.

  • Test Network Services.

  • Shut down links and services.

Feedback to webmaster