|
|
HP 3000 MPE/iX Release 6.0 System Software Maintenance Manual (Release C.60.00): HP 3000 MPE/iX Computer Systems > Chapter 2 Task ChecklistsChecklist I. Modify Remote System |
|
Use this task checklist if your source material was on CD-ROM and you are now using a CSLT tape to:
Print a copy of this checklist for each remote system that you are updating. Read and perform the steps only in the following sections on your remote system: Begin Preparation Tasks. Does not require exclusive access to the system. Log onto your remote system.
Preparation Tasks completed. Schedule downtime for exclusive access. Begin Exclusive Access Tasks.
Checklist I tasks completed. If you have Reactive patches to apply, proceed to one of these checklists:
Record system change:
|
|