HPlogo HP 3000 MPE/iX Release 6.0 System Software Maintenance Manual (Release C.60.00): HP 3000 MPE/iX Computer Systems > Chapter 2 Task Checklists

Checklist G. Update with Tape

» 

Technical documentation

Complete book in PDF
» Feedback

 » Table of Contents

 » Glossary

 » Index

Use this task checklist if your source material is on tape and you are using a CSLT tape to:

NOTE: You cannot apply Reactive patches at the same time you are updating the system. You must apply Reactive patches after you update the system. To apply Reactive patches (after you update the system) refer to Checklist A, "Manage Patches," or Checklist B, "Manage Patches by Staging Area."

Print a copy of this checklist for each system that you are updating.

Read and perform the steps only in the following sections:

Begin Preparation Tasks. Does not require exclusive access to the system.

Preparation Tasks completed. Schedule downtime for exclusive access.

Begin Exclusive Access Tasks.

  • Chapter 5 “Modifying Your System”

    • 5.1 Securing and Backing Up the System for Tape Tasks

      Record terminated logging processes:

      Record system files with lockwords:

      Record temporary filename for the COMMAND.PUB.SYS file:

    • 5.2 Applying the SLT

    • 5.4 Starting the System.

    • 5.7 Creating the CSLT Using AUTOINSTSelect option 3 FOS, SUBSYS, PowerPatch if you have a PowerPatch tape, or if no PowerPatch, select option 4 FOS and SUBSYS.

      Record manually installed products:

      Record data communication products:

    • 5.13 Applying the CSLT Modification

    • 5.14 Restarting the System

    • 5.15 Rerunning AUTOINSTRequired only if applying PowerPatch.

  • Chapter 6 “Finishing the Process”

    • 6.1 Configuring Datacomm and UPS

    • 6.4 Setting Passwords, Lockwords, and UDCs

    • 6.5 Configuring and Updating Manually Installed Products

    • 6.6 Setting Up the TAR Utility

    • 6.7 Performing the Final Reboot

    • 6.8 Restarting Selected System Functions

    • 6.9 Backing Up Your System

    • 6.11 Finishing Up

Checklist G tasks completed.

If you have Reactive patches to apply, proceed to either one of these checklists:

  • Checklist A, "Manage Patches"

  • Checklist B, "Manage Patches by Staging Area"

Record system change:

  • System name:

  • System type:

  • Date change made:

  • Change performed by:

  • OS version from:

  • OS version to:

  • Comments:

Feedback to webmaster