Use this task checklist if your source material is on tape
and you are using a CSLT tape to:
Print a copy of this checklist for each system that you are
applying add-on products to.
Read and perform the steps only in the following sections:
Begin Preparation Tasks. Does not require exclusive access to the system.
- Chapter 3 “Planning for Your Task”  - 3.1 Verifying Required Materials 
- 3.2 General Planning Tasks 
- 3.6 Estimating Disk Space - Record contiguous disk space: - Record non-contiguous disk space: 
 
Preparation Tasks completed. Schedule downtime for exclusive access.
Begin Exclusive Access Tasks.
- Chapter 5 “Modifying Your System”  - 5.1 Securing and Backing Up the System for Tape
Tasks - Record terminated logging processes: - Record system files with lockwords: - Record temporary filename for the COMMAND.PUB.SYS
file: 
- 5.7 Creating the CSLT Using AUTOINST—Select option 5 Add-on (SUBSYS only).  - Record manually installed products: - Record data communication products: 
- 5.13 Applying the CSLT Modification 
- 5.14 Restarting the System 
 
- Chapter 6 “Finishing the Process” - 6.1 Configuring Datacomm and UPS 
- 6.4 Setting Passwords, Lockwords, and UDCs 
- 6.5 Configuring Manually Installed Products 
- 6.7 Performing the Final Reboot 
- 6.8 Restarting Selected System Functions 
- 6.9 Backing Up Your System 
 
Checklist D tasks completed.
If you have Reactive patches to apply, proceed to one of these
checklists:
- Checklist A, "Manage Patches" 
- Checklist B, "Manage Patches by Staging
Area" 
Record system change: