Use this task checklist if your source material is on tape
and/or electronically downloaded files, you are managing
your patches, and you are using a staging area
on disk to apply:
|  | 
|  |  | 
|  | 
|  | NOTE: Not all patches are stageable. For more information,
refer to item 19 in section 3.2, "General Planning Tasks." | 
|  | 
|  |  | 
|  | 
Print a copy of this checklist for each system that you are
applying patches to.
Read and perform the steps only in the following sections:
Begin Preparation Tasks. Does not require exclusive access to the system.
- Chapter 3 “Planning for Your Task” - 3.1 Verifying Required Materials  
- 3.2 General Planning Tasks 
- 3.6 Estimating Disk Space - Record contiguous disk space: - Record non-contiguous disk space: 
 
- Chapter 4 “Preparing Your System” - 4.1 Reserving Disk Space for Tape Tasks  
- 4.4 Initializing HP Stage/iX 
- 4.7 Starting the Patch Management Tools 
- 4.8 Selecting HP Patch/iX Activities 
- 4.9 Viewing Patches—Optional 
- 4.11 Creating a Patch Tape or Staging Area - Record manually installed products: 
 
Preparation Tasks completed. Schedule downtime for exclusive access.
Begin Exclusive Access Tasks.
- 5.11 Securing the System - Record terminated logging processes: - Record temporary filename for the COMMAND.PUB.SYS
file: 
- 5.12 Shutting Down the Remote System 
- 5.14 Restarting the System 
 
- Chapter 6 “Finishing the Process” - 6.4 Setting Passwords, Lockwords, and UDCs 
- 6.8 Restarting Selected System Functions 
- 6.9 Backing Up Your System 
- 6.10 Permanently Applying a Staging Area-optional. 
 
Checklist B tasks completed.
Record system change: