Modify the Network Management Configuration File (contd) [ Configuring and Managing Host-Based X.25 Links ] MPE/iX 5.0 Documentation
Configuring and Managing Host-Based X.25 Links
Modify the Network Management Configuration File (contd)
Step 15: Reboot the Host and the DTC
The MPE/iX system and the DTC must be rebooted after initial
configuration and after the network management configuration filehas been
modified.
To reboot the MPE/iX system, do the following:
1. Enter these commands at the MPE/iX prompt (:):
Table 3-10.
-------------------------------
| | |
| : | [CTRL]-A |
| | |
-------------------------------
| | |
| = | SHUTDOWN |
| | |
-------------------------------
2. The system will display various shutdown messages. Wait until the
following message is displayed on the screen:
Shutdown of operation system complete
3. Enter these commands:
Table 3-11.
-------------------------------
| | |
| | [CTRL]-B |
| | |
-------------------------------
| | |
| CM> | RS |
| | |
-------------------------------
4. Answer YES to the question: Restart the system?.
The system will reset and display the ISL prompt. Type the
following command to start the system:
ISL> START NORECOVERY
_________________________________________________________________
NOTE [CTRL]-A means press the [CTRL] key and the A key
simultaneously.
Shutdown normally takes several minutes.
_________________________________________________________________
5. To reset the DTC, turn off the power and then turn on the power
again for the DTC. You should reboot the DTC after rebooting the
MPE/iX system.
You may also use TermDSM, an online diagnostic program for
host-managed DTCs, to reset the DTC. Refer to Troubleshooting
Terminal, Printer, and Serial Device Connections manual
(32022-61002) for more information.
MPE/iX 5.0 Documentation