HP 3000 Manuals

Ch 14. Operating the Network [ HP3000/iX Network Planning and Configuration Guide ] MPE/iX 5.0 Documentation


HP3000/iX Network Planning and Configuration Guide

Chapter 14  Operating the Network 

After you have completed the configuration process, you are ready to
activate NS. This chapter shows you how to bring up an NS3000/iX node and
how to shut it down.  It assumes you have successfully completed the
configuration steps described previously.

For more detailed information on starting, stopping, and operating an NS
network, see the NS3000/iX Operations and Maintenance Reference Manual.

This chapter includes step-by-step instructions to help you perform the
following tasks:

   *   Start links and services.

          *   Start software loopback (optional).

          *   Start the links.

          *   Start Network Services.

   *   Test Network Services.

   *   Shut down links and services.



MPE/iX 5.0 Documentation